Quantcast
Channel: SCN : All Content - SAP Transportation Management (SAP TM)
Viewing all articles
Browse latest Browse all 533

Enforce a stop without transshipment

$
0
0

Hello everyone,

 

do you know a possibility to enforce an additional stop in a freight order without having loading/unloading activities or transshipment there?

 

The background of my question is the following scenario: We have a larger site with multiple loading points, but only one central check-in/out building. Freight orders shall contain the check-in/out building as a stop. This is because we want to model check-in and check-out as events.

 

The most straightforward approach that came to my mind was: Group all locations on the site in one zone, create intrazone lane and a lane from the zone to the check-in/out location. Only from that location there are lanes to all the destinations we might want to ship to. But this is only possible if I assign the check-out location as a transshipment location for the zone as well as for the destinations. In planning, this results in two freight orders being built, one going from zone locations to check-out location, the other going from there to the final destination. But this is not what I want to achieve. I just want an additional stop in a single freight order where (from planning point of view) nothing happens. Any ideas how to achieve this?


Viewing all articles
Browse latest Browse all 533

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>